New building under construction, delivery November 2025. Ground floor 4-room apartment consisting of: Entrance to a large living room leading to a large garden through a sliding glass door, eat-in kitchen, night hallway, double bedroom, two single bedrooms, and two bathrooms. The property includes a cellar. Availabilit
New building under construction, delivery November 2025. Ground floor 4-room apartment consisting of: Entrance to a large living room from which you can access the garden through a sliding glass door, night hallway, double bedroom, two single bedrooms and two bathrooms. The property includes a cellar. Availability of g
New building under construction, delivery November 2025. 4-room apartment on the second floor consisting of: Entrance to a large living room from which you can access the large terrace through a sliding glass door, habitable kitchen, night hallway, storage room, double bedroom, two single bedrooms, two bathrooms and a
New building under construction, delivery November 2025. 4-room apartment on the third floor consisting of: Entrance to a large living room from which you can access the large perimeter terrace through a sliding glass door, habitable kitchen, night hallway, storage room, double bedroom, two single bedrooms and two bath